Trackside Improvements

20190513_162119

  1. The last few days have been spent ballasting the track that runs behind platform 2 of the LMS Avenue Station – the line which joins the LMS service with the GWR. The photograph above shows the work in progress.

20190513_162322

2. Above is a photograph from the opposite direction and showing a grassy bank that has been created. You can also see the beginnings of the backdrop behind the station building on platform 1.

20190513_161632

3. Here is track layout experiment showing the possible addition of a goods siding into the GWR General Station – the line and points on the right of the photograph have been positioned on the baseboard to examine if it visually enhancing to have this capability, and to also understand if the Leamington goods shed can be squeezed into the space between that line and the edge of the baseboard.

Leave a comment