
Red brick walling has been positioned to the right of the subway. All structures are being temporarily placed in position to assess correct sizing. The main entrance lobby area in front of the main building is to be added next.
Some experimentation of ‘stone covering paper’ on the buildings will be required to match the style of the General station. A commercial product is not available – so some home crafted solution is needed. The photograph below shows the effect of one sample stone covering used on the subway entrance.
